Renaissance JSCo works on repair and restoration of buildings in Lviv and the region, including older housing stock and buildings under heritage protection.
Owners usually arrive with a practical problem: damp, a failing roof, windows that let the winter in. The complication is that on a protected building the answer is not simply "replace it" — and the cheapest quote is often the one that creates a legal problem on top of the building problem.
Protection is not a single status. A building may be an individual monument, or it may sit inside a protected area or buffer zone where the rules reach the exterior, the roofline and sometimes the courtyard. An owner's first task is to establish which applies, in writing, from the competent authority — before designing anything.
Two prices for the same facade can differ by a factor of three. The gap is almost never in the labour rate.
Condition surveys of masonry, roofs, joinery and damp, with findings written down rather than summarised over the phone.
Repair and conservation of facades, plasterwork, stone details, joinery and roofs, on buildings where those materials matter.
Ordinary repair of ordinary buildings, done properly. Not everything is a monument, and not everything needs to be treated as one.
Often they can be repaired, and on a protected building repair may be what is required. Ask for a survey of the existing joinery before ordering replacements — replacement is the decision that cannot be reversed.
That tells you what the neighbours did, not what was permitted. Rules differ by status and by what the facade carries, and enforcement sometimes arrives years later.
Longer than owners expect and not something a contractor can promise. Build the time into the plan and do not let a season's weather push the works ahead of the paperwork.
Not always, and the honest comparison is over decades. A correct repair on a breathable wall outlasts a cheap coating that has to be removed again — together with whatever it damaged.
The facade, the problem area and, if you have it, the building's documents. That is usually enough to say what the first step should be.